Construction of the January 13th Memorial at the Seimas of the Republic of Lithuania

More about the project: UAB „Naresta“ as a General Contractor implemented architect’s K. Kisielius vision performing construction works of Memorial of the 13th of January at the Seimas of the Republic of Lithuanian under the order of the Office of the Seimas of the Republic of Lithuanian of 2007.Glass fixing system has been used in this object to a greater extent for the first time in Lithuania. Shatterproof glass plates were fixed with special holders at steel cables which were strained between roof and floor. In order cable tension does not change due to variations of temperature special tension maintenance spring-loaded mechanism was integrated into the system. Structure is not only aesthetic but also durable. Barricades which protected parlament from soviet tanks and authentic crosses were covered under it, hall with photos of the 13th of January and participants’ witnesses was equipped inside.