Directorate of border crossing infrastructure under the Ministry of Transport and Communications Latežerio border crossing design and construction works
More about the project: Latezerio border crossing PKP is installed with modern facilities, infrastructure, built in administrative, passengers and motor vehicles screening equipment. This control point is the first set after Lithuania’s accession to the EU installed lanes to work on the reverse principle.
- Latežerio sen., Druskininkų raj.
- End date of the construction works: 2015
- Property type: infrastructure object
- Building area: 478,2 m ²
- Infrastructure area - 7798 m ²